
I.OVERVIEW
Permitted. Contained. Hauled Away.
Paragon Home Services handles residential demolition across the South Bay: interior gut demo for kitchen and bathroom remodels, wall removal, concrete driveway and patio tear-out, and full removal of garages, sheds, and other structures. As a licensed general contractor, we pull the demolition permit, coordinate utility disconnects, arrange asbestos and lead testing when the home's age calls for it, and haul the debris off site. Price depends on the size of the demo, the material, site access, and disposal fees, and every job is quoted after a site walk. For junk hauling, cleanouts, or dump trailer rental without demolition, see our junk removal service.
II.WHY IT MATTERS
Most residential demo is selective: removing cabinets, tile, drywall, and fixtures down to the studs so a kitchen, bathroom, or addition can be rebuilt. The rest of the house has to stay intact and livable, so floor protection, dust containment at doorways, and careful cuts at the edges of the work area matter as much as the tear-out. Full structure demolition, such as a detached garage, a shed, or clearing a lot for an ADU or new home, is a different job. It needs its own demolition permit, disconnected and capped utilities, and a plan for the foundation and slab.
Old driveways, patios, walkways, block walls, and pool decks are some of the heaviest material on a residential lot. The cost depends on slab thickness, whether it is reinforced with rebar or wire mesh, and how equipment gets in. A wide driveway lets a skid steer and truck work quickly. A backyard reached only through a narrow side yard may mean breaking and wheeling material out by hand. Clean concrete, brick, and asphalt can usually go to a recycling facility and be crushed into base material, which is often cheaper than landfill disposal.
Full demolition needs a city permit, and the electric and gas services must be disconnected by SCE and SoCalGas before work begins. Water and sewer lines are capped to your city's requirements. Homes built before 1978 may contain lead-based paint, and older homes often have asbestos in materials like popcorn ceilings, flooring, pipe wrap, and stucco. South Coast AQMD Rule 1403 requires an asbestos survey before demolition or renovation that disturbs those materials. Full demolitions also require advance notice to the district. We coordinate the testing, and any asbestos found is removed by a certified abatement contractor before our crew starts.
III.PROCESS
IV.CAPABILITIES
V.OUR COMMITMENT
VI.FAQ
VII.THE PARAGON DIFFERENCE
The Work
Interior gut demo, wall removal, concrete and hardscape tear-out, and full structure demolition, with permits, utility coordination, and debris haul-off handled.
The Paragon Difference
A licensed general contractor runs the demo, so permits, hazardous-material testing, and protection of everything that stays are planned before the first swing.
VIII.SERVICE AREAS
IX.CONTINUE
Related Outdoor Services