
I.OVERVIEW
Paragon Home Services has served Torrance homeowners since 2007 — 18+ years of adu construction (detached & attached) experience specific to the South Bay's unique construction era, climate, and infrastructure. Every project is managed by licensed, W-2 technicians with the tools and expertise your home deserves.
II.LOCAL CONDITIONS
The Torrance Challenge
Predominantly single-family residential with a strong owner-occupied base. Older housing stock (1950s–1970s) presents high demand for plumbing upgrades and electrical panel replacements.
The Paragon Solution
Paragon Home Services has served Torrance homeowners since 2007 — 18+ years of adu construction (detached & attached) experience specific to the South Bay's unique construction era, climate, and infrastructure challenges. Every project is managed by licensed, W-2 technicians with the tools and expertise your home deserves.
III.PROCESS
Initial site visit and feasibility — we walk the lot, identify the best ADU placement, verify setbacks, and confirm code feasibility.
Design and pricing — architectural floor plans and elevations, fixed-price proposal, and a realistic timeline.
Engineering and Title 24 — structural engineering, energy compliance documentation, and MEP coordination.
Permit submission — full plan set submitted to the city; we manage plan check responses.
Site preparation — utility locating, demolition (if needed), grading, and foundation excavation.
Foundation and framing — engineered foundation poured, framing erected to plan, sheathed and dried-in.
MEP rough-in — plumbing, electrical, and mechanical rough-in with city inspections at each phase.
Insulation, drywall, and finishes — exterior siding/stucco, interior finishes, kitchen and bath fit-out.
Final inspections and certificate of occupancy — city signs off, you receive the C of O, and the unit is rentable or occupiable.
IV.CAPABILITIES
V.PARAGON IN TORRANCE
Neighborhoods: the South Bay's largest city and home to a dense concentration of established neighborhoods including Old Torrance, Hollywood Riviera, and Walteria
ZIP codes served: 90501, 90502, 90503, 90504, 90505, 90506
Fully Licensed & Insured · Fully Licensed & Insured
Established 2007 — 18+ years South Bay experience
24/7 emergency response
VI.FAQ
VII.CONTINUE
View the full ADU Construction (Detached & Attached) service page for detailed scope, process, and pricing:
ADU Construction (Detached & Attached) — Full Service PageMore Services in Torrance