
I.OVERVIEW
Level 2. Permitted. Inspected.
EV charger installation means adding a Level 2 charging station at your home on a dedicated 240-volt circuit run from your electrical panel, which typically restores roughly 20 to 45 miles of range per hour depending on the vehicle and circuit size. The job covers a load calculation to confirm your panel can carry the new circuit, the wire route to the garage or driveway, mounting a hardwired wall charger or an outlet for a plug-in unit, and a permit and inspection from your local building department. Paragon installs chargers for Tesla, Rivian, Lucid, Ford, Hyundai, BMW, and other makes with the correct connector for your car.
II.WHY IT MATTERS
Bigger is not automatically better. A 40-amp circuit supporting about 32 amps of charging, roughly 7.7 kilowatts, refills most commutes overnight with room to spare. A 60-amp circuit allows 48-amp charging for large-battery trucks and SUVs, but many cars cannot accept that rate, and the circuit consumes panel capacity you may want later for a heat pump. Because charging is a continuous load, code requires the circuit to be sized at 125 percent of the charger's output. We match the charger setting to your vehicle's onboard charger and your real daily mileage.
A plug-in charger on a NEMA 14-50 outlet is portable, but the outlet has real drawbacks for nightly use. Current code requires ground-fault protection on receptacles installed for EV charging, and some chargers' own internal protection conflicts with a GFCI breaker and trips it. Inexpensive receptacles can also loosen and overheat after years of multi-hour charging sessions. A hardwired unit sidesteps both issues and can charge at a higher rate. We hardwire in a garage you own and reserve a heavy-duty receptacle for cases where portability genuinely matters.
Plenty of older homes in Torrance, Gardena, and Redondo Beach have a detached garage at the back of the lot, which means a long wire route, trenching, or a small subpanel — and that shapes the price far more than the charger does. Driveway and carport installations need outdoor-rated equipment, and near the water we favor enclosures and fittings that tolerate salt air. In Playa Vista, Marina del Rey, and similar communities, California law limits how far an HOA can block a charger, though the association may still require approval, insurance, and a metering arrangement.
III.PROCESS
IV.CAPABILITIES
V.OUR COMMITMENT
VI.FAQ
VII.THE PARAGON DIFFERENCE
The Work
Level 2 home EV charger installation: load calculation, a dedicated 240-volt circuit, hardwired or plug-in charger mounting, and the city permit and inspection.
The Paragon Difference
We size the circuit around your car, your panel, and where you actually park — and we say plainly when a load-management device will spare you a panel upgrade.
VIII.SERVICE AREAS
IX.CONTINUE
Related Electrical Services