
I.OVERVIEW
Handle EV Chargers, Solar, and Modern Loads Safely.
An electrical panel upgrade replaces your home's main breaker panel — usually along with the meter socket and service entrance conductors — so the house can safely carry more power, most often moving from 100-amp to 200-amp service. In the South Bay the trigger is typically an EV charger, a heat pump, a kitchen remodel, an ADU, or an aging Federal Pacific or Zinsco panel. Paragon handles the sequence end to end: a load calculation to confirm the size you need, the electrical permit from your city building department, scheduling with Southern California Edison for the disconnect and reconnect, installation by a licensed electrician, and the final city inspection. The power outage itself is usually limited to part of one day.
II.WHY IT MATTERS
The amperage on the label doesn't tell you whether you are out of room. The California Electrical Code, which is based on the NEC, sets out a calculation method that adds up your existing appliances, square footage, and heating and cooling, then layers in the equipment you plan to add. Plenty of 1,400-square-foot Torrance ranch homes on 100-amp service can take a Level 2 charger with no upgrade at all. A Manhattan Beach rebuild with a heat pump, induction range, and two EVs generally cannot. The calculation settles the question and gives the inspector a documented basis.
Many South Bay homes built in the 1950s and 1960s still carry Federal Pacific Stab-Lok or Zinsco panels. Both brands have well-documented problems: breakers that may fail to trip under overload, and in Zinsco's case, breakers that can loosen and arc against the bus bar. Fused 60-amp services and split-bus panels with no single main breaker turn up in the same neighborhoods. Replacing one of these is worth doing on its own safety merits even if you are not adding load, and home inspectors routinely flag them during a sale.
A full service upgrade is not the only answer. When the calculation lands close to the limit, an energy management device that pauses EV charging while the dryer runs, a modest subpanel fed from existing service, or phasing electrification over a few years can keep you where you are. When an upgrade is warranted, condition matters: exterior meter-main enclosures on homes near the water in Hermosa Beach, Redondo Beach, and Playa del Rey take a beating from salt air, and older homes often ground only to a water pipe, so grounding and bonding usually need bringing up to current code.
III.PROCESS
IV.CAPABILITIES
V.OUR COMMITMENT
VI.FAQ
VII.THE PARAGON DIFFERENCE
The Work
Main panel replacement and service upgrades from 100 to 200 amps or more, subpanels, and replacement of obsolete Federal Pacific and Zinsco panels, with permit, inspection, and Southern California Edison coordination handled for you.
The Paragon Difference
We run a load calculation before recommending anything, so you buy the capacity your home actually needs instead of the largest panel we could sell you.
VIII.SERVICE AREAS
IX.CONTINUE
Related Electrical Services