I.OVERVIEW
Permitted. Coordinated. Built Around Your Lease Date.
Paragon builds tenant improvements for office, medical, retail, and flex spaces across the South Bay — the demolition, framing, drywall, ceilings, doors, finishes, and flooring that turn a shell or second-generation suite into a space you can occupy. A TI project runs on more than construction: permits and plan check, landlord work-letter requirements, accessibility upgrades under California's CBC Chapter 11B, and a lease commencement date that doesn't move. We coordinate with your architect, your property manager, and licensed electrical, plumbing, HVAC, and fire sprinkler trades, schedule disruptive work after hours in occupied buildings, and hand over the closeout documentation landlords and lenders ask for.
II.WHY IT MATTERS
Most tenant improvements that add or move walls, change lighting, alter restrooms, or change how a space is occupied require a building permit with plan check, and many also need fire department review for sprinkler and alarm changes. Lighting alterations generally require Title 24 energy compliance documentation. On a small TI, plan check frequently takes longer than the construction itself, which means the permit path — not the build — is usually what threatens a lease commencement date. Start drawings early, and don't plan a move-in before final inspection and any required city sign-off.
California enforces accessibility through CBC Chapter 11B, which is frequently stricter than the federal standards. The area you alter has to comply, and the alteration can also trigger upgrades along the path of travel serving it: entrance, restrooms, drinking fountains, parking, and signage. When the adjusted construction cost is at or below a valuation threshold that's adjusted annually, required path-of-travel spending is generally capped at 20 percent of that cost; above the threshold, full path-of-travel compliance is generally expected. Older South Bay buildings often have non-compliant restrooms, so price this in early.
Your lease and work letter often govern more than the drawings do: who pays for what, the size of the TI allowance, required building-standard finishes and hardware, approved contractor lists, insurance minimums, and when work is allowed to happen. Property managers usually want drawings for approval, certificates of insurance, and a schedule before anyone mobilizes. In multi-tenant buildings, demolition, core drilling, and powder-actuated fastening are commonly restricted to after hours, with freight and loading access reserved in advance. Read the work letter before pricing the job.
III.PROCESS
IV.CAPABILITIES
V.OUR COMMITMENT
VI.FAQ
VII.THE PARAGON DIFFERENCE
The Work
Office, medical, retail, and flex space tenant improvements — demolition, framing, drywall, ceilings, doors, finishes, and accessibility upgrades.
The Paragon Difference
We plan the job around plan check, landlord rules, and your lease date, and keep occupied buildings working while we build. Commercial kitchens excluded.